61. Abrasion Project ORPC Worthington

61. Abrasion Project ORPC Worthington

Water Power Peer Review Abrasion Testing of Critical Components of Hydrokinetic Devices 1 | Program Name or Ancillary Text Monty Worthington ORPC Alaska [email protected] November 1-3, 2011 eere.energy.gov Purpose, Objectives, & Integration Tidal and river sites in Alaska typically have high suspended sediment concentrations, primarily due to predominant glacial influences and the fine particulate silt that they introduce, that will potentially effect MHK technology lifetime and maintenance

intervals. It is necessary that ORPC adapt the design of its components to these conditions early on in the development of ORPCs technology. Lessons learned will be widely applicable both in ORPCs Alaska projects and in future hydrokinetic projects worldwide. This will directly address DOEs goals of accelerating successful tidal energy technology deployment in challenging conditions, thus opening up project development in more diverse locations. 2 | Wind and Water Power Program eere.energy.gov Technical Approach Design, test prototype, build out Initial test station designed, fabricated,

assembled, and tested prior to release of additional stations for manufacture Reduces risk of design errors on full flume Allows for modifications after initial testing Bearing and seal matrix developed Incorporate input from Project partners, manufacturers and industry experts Allows for concise informed decision making on choices for testing Instrumentation package specified and tested Data collection protocols and instrumentation installed and tested on test station 3 | Wind and Water Power Program eere.energy.gov Plan, Schedule, & Budget Schedule: Initiation date: 09/01/2010 Planned completion date: 02/29/2012 The start date for the project was delayed nearly full year due to a delay in the release of DOE funds for the project (01/06/2011). This problem, coupled with delays in the flume construction, has led to a delay of 1.25 years for the project.

Milestones for FY 10 and FY11: Task 1 Flume Design and test specifications completed 3/1/11 Task 2 First station of flue constructed 5/19/11 Task 3 First station of flume tested 9/30/11 Task 4 Bearings and seals for testing selected 9/15/11 Task 5 Flume design modified as needed and other station 10/7/11 Task 6 Full flume assembled 1/7/12 Task 7 Flume testing begins 1/14/12 Go/no-go decision points for FY12 and FY13: No date established. Budget: Project costs are currently tracking with the original budget. Project budget expended to date: $89,027.53, Less than anticipated due to late start of project and subsequent delay in drawdown of funds. Budget History FY2009 FY2010 FY2011 DOE

Cost-share DOE Cost-share DOE Cost-share $0 $0 $0 $0 $89,027.53 $5,316 4 | Wind and Water Power Program eere.energy.gov Accomplishments and Results

Test Flume design, fabrication, and calibration complete Test protocols defined and instrumentation designed, procured, data collection initiated Matrix of candidate bearings/seals developed and test bearings and seals procured 5 | Wind and Water Power Program eere.energy.gov Challenges to Date Challenges: Project delays due to funding release and time conflicts with UAA schedule Logistical challenges installing flume (wiring upgrade required at test site) Resolution: Monthly update meetings held to identify scope, schedule, budget concerns, and assign roles and

coordinate to resolve issues in a timely manner 6 | Wind and Water Power Program eere.energy.gov Next Steps FY12 and Project Completion: Full flume assembled, long term testing initiated Jan 2012 6 months data collected, reported on July 2012 12 months data collected, reported on February 2013 Final report with recommendations complete May 2013 Future Steps: Field testing of bearings and seals in ORPC devices in high suspended sediment river environments Construction and testing of prototype UAA designed bearings Abrasion testing of other device components (i.e., foil composites, etc) 7 | Wind and Water Power Program eere.energy.gov

Recently Viewed Presentations

  • Float Zone & Bridgman Crystal Growth Techniques 1

    Float Zone & Bridgman Crystal Growth Techniques 1

    ohmic (1-10 Kohm.cm) wafers as well as wafers with a narrow specified electrical resistivity. Float . zone silicon is typically used for power devices and detector applications. It . is good for solar cells, power electronic devices (thyristors. and rectifiers)...
  • Welcome, one and all! Introduction to the Lectionary for Mass

    Welcome, one and all! Introduction to the Lectionary for Mass

    EASTER - Resurrection of Jesus Easter Triduum (3 holy days: Thurs. eve - Sun. eve) Holy Thursday (Last Supper); Good Friday (Crucifixion) Easter Vigil (Sat. evening; baptism of neophytes) Easter Sunday (Sun. after first full moon in Spring) Easter Octave...
  • GOLD SPONSORS - Americollect

    GOLD SPONSORS - Americollect

    Provide the Final Notice with 30 days to pay before initiating ECAs. How will your organization notify your collection agency if you approved an application and ECAs have to be reversed and a notice was sent to the responsible individual...
  • Supervised Agricultural Experience

    Supervised Agricultural Experience

    Describe a Supervised Agricultural Experience (SAE); Work for someone else . OR. ... Examples of RESEARCH SAE's. ... RESEARCH SAE's in our FFA Chapter. 2. Explore SAE opportunities and possibilities; Show pictures and highlight your student's SAE's here. Types of...
  • Investing Public Funds

    Investing Public Funds

    WAM and maturities and authorized investments. Define guidelineson investments to direct high credit quality. Provide for flexibility (maturity) Provide for control on extension risk (WAM) Allow entities to adjust to changes internally and externally.
  • Mapping the Impact of New Media in India

    Mapping the Impact of New Media in India

    "Global village" enunciated by Marshall McLuhan, as early as the 1960's can be applied to digital media; ... Mr. Narendra Modi had more than 16 million Facebook likes (second most for any politician in the world) ... over 110,000 newspapers...
  • Contents

    Contents

    Working with WEKA machine learning toolbox. J48 decision tree, Adaboost J48 and SVM. Confusion Matrix, Accuracy, Kappa and ROC. kappa >0.4 is acceptable, >0.75 is better. Purpose: to classify drinking and non-drinking from physiologic features. 1 hour
  • Revenue Recognition Deep Dive - Institute of Internal Auditors

    Revenue Recognition Deep Dive - Institute of Internal Auditors

    Acceptable estimation methods include, (1) the adjusted market assessment approach, (2) the expected cost plus margin approach, and (3) the residual approach (when the stand-alone selling price is not directly observable and is either highly variable or uncertain).