Earthwork QTO - University of Washington

Earthwork QTO - University of Washington

Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction

Design Stage 4: Project Close-out r o

w h t r a E

O T kQ Earth Work QTO Soils that contain large amounts of clay or organic materials or soils that are

contaminated are not suitable for fill. The ideal situation is that the amount of usable cut equals the amount of fill. Soil Volume Changes The soil will be in one of three conditions: Loose: after cut. Least unit mass and

maximum volume. Compacted: after the soil is dumped and utilized as fill. Highest unit mass and least volume. In situ or bank: In between unit mass and volume.

Basic Terminology Volumetric Measures: Vl, Vb, Vc.

In meters. Density Measures:

Sw = Swell, density, percentage. Sh = Shrinkage, density, percentage. Wl = Weight per Loose Cubic Meter Wb = Weight per bank Cubic Meter Wc = Weight per compacted Cubic Meter Common Formulation

Wb = Wl ( 1 + Sw ) Wb = Wc ( 1- Sh ) Sw = (Wb / Wl ) 1 = (Vl / Vb ) -1 Sh = 1- (Wb / Wc) {relationship between bank and compacted} Swell Factor = Load Factor (LF) = Wl /Wb = 1/ (1+ Sw) = Vb / Vl

or Vl = Vb (1+ Sw) Multiply the bank weight by the load factor to get loose wt. Wl = LF * Wb Shrinkage Factor (SF) = Wb / Wc = 1 - Sh

Vl = Vb / LF = Vc /(LF *SF) Vb = Vc / SF = Vc /(1 - Sh ) = (Wc * Vc ) / Wb Then, Vl = Vb (1+ Sw) , Vc = Vb (1 - Sh ), and LF = Vb / Vl = Wl /Wb = 1/(1+ Sw) Example

A given material exhibits the following characteristics: shrinkage = 10% swell = 15%. if 10,000 cubic meters (in situ measure) of material are to be transported in trucks capable of carrying 8 cubic meters, how many truck loads will be required? How much volume will the material consume when compacted? total number of truck loads = 10,000 (1 + 0.15) / 8 = 1438

compacted volume = 10,000 (1 - 0.1) = 9000 cubic meters If the material has an in situ (bank) unit mass of 1600 kilograms per cubic meter, how heavy is a single truck load? LF = Wl /Wb = 1/(1+ Sw) = 0.87, Wl = Wb (LF) then load per truck load = 8 X 1600 X 0.87 = 11,136 kilograms. Grid (Borrow-Pit) Method

Consists of overlaying the topographic information of the site with a grid Grid size is determined according to the desired level of accuracy. The volume on any part of the grid is equal to the area of that part times the average height of cut or fill over that part.

Elevations at the corners of the grid are estimated from the contour lines within a foot, usually. 40 ft grid each square is 40 ft Before After

The height of cut or fill is computed at the corners of the grid. A line at design elevation is drawn to separate the cut from the fill. Points along that line are of zero cut or fill (the daylight point). The volume of the cut or fill on the full squares is computed first. The volume of the cut or fill on the rest of the shapes is then computed individually.

The total Volume of the cut and the total volume of the fill are then computed Examples and homework Double End-Area Method More Suitable for linear structures such as highways and utility trenches.

The method consists of cutting a series of parallel cross-sections through the transverse direction of a given cut and/or fill area. A minimum of two section cuts must be made on a project. The number of the cross sections needed depends on how rough the topography is. The existing and the proposed topography are drawn to scale at each cross section. Section cuts could be cut, fill or transition.

A reference vertical line is chosen along the cross sections. The distance of each inflection point from that reference line is written on that point. Distances to the left of the reference line are considered negative. A scale that represents the elevations is drawn to the right of the cross sections. The area of the cross section is then computed using the traverse area

method. Assuming that the values along the X axis are the distances from the reference line, and that the values along the Y axis are the elevations, the area can be computed as follows: A = 1/2 { Xi (Yi+1 Yi-1)} Volume between two end areas is then

computed. That volume is equal to the average of the two areas times the distance between them. The cut and fill volumes are computed and summed up separately. Example

51

Recently Viewed Presentations

  • Quelle entrée dans le curriculum de l'information-documentation?

    Quelle entrée dans le curriculum de l'information-documentation?

    Page web, serveur de données, formulaire de recherche, mot-clé, chaîne de caractères, recherche en texte intégral, spider, robot d'indexation, indice de popularité, etc. En situation, séance 1 : 1- Mise en activité à partir d'une consigne simulation d'une recherche type...
  • Presentazione di PowerPoint

    Presentazione di PowerPoint

    Competenze e caratteristiche dell'Infermiere di Triage Caposala - MCAU del P.O. Ingrassia di Palermo Direttore: Dott. Stefano La Spada Recenti e profonde mutazioni della sanità negli ultimi anni: Nascita delle Aziende Ospedaliere Competitività tra operatori della sanità Qualità dei servizi...
  • Avaya Wireless Outdoor Router RF Technology

    Avaya Wireless Outdoor Router RF Technology

    Antenna systems RF propagation Basic antenna operation Antennas are specific to Frequency based on dimensions of elements 1/4 Dipole (Wire 1/4 of a Wavelength) creates a Standing Wave signal in at 0 impedance MAX voltage to generate MAX Magnetic field...
  • Confidentiality and Anonymised Survey Records: The UK Experience

    Confidentiality and Anonymised Survey Records: The UK Experience

    Dr Paul Williamson Dept. of Geography University of Liverpool Collaborators: Robert Tanton (NATSEM, Australia) ... Economic activity / age /sex 0 0 0 0 Migration / age 27 77 60 76 Cars / adults 87 52 96 31 Headship /...
  • Cómo Pagar Una Educación Universitaria

    Cómo Pagar Una Educación Universitaria

    I hope you feel better prepared for the financial aid process after receiving this information. However, I know it's possible to have questions at a later time. So that you feel comfortable asking questions, we have launched a text messaging...
  • KMOS operations and performance Presentation to the KMOS

    KMOS operations and performance Presentation to the KMOS

    KMOS operations and performance Presentation to the KMOS ESO IST, 10th May 2006 KMOS operations Observation preparation Configuring the arms Sky subtraction options During the observations Source acquisition Observation of calibration stars After the observations Daytime calibration Post processing steps...
  • Mikrobiologický ústav LF MU a FN u sv. Anny v Brně

    Mikrobiologický ústav LF MU a FN u sv. Anny v Brně

    Etiology of skin fungal infections Etiology differs in superficial mycoses mucocutaneous mycoses cutaneous mycoses subcutaneous mycoses opportune skin mycoses Etiology of superficial skin mycoses Pityriasis versicolor Large hyper- or hypopigmented spots without marks of inflammation Fluorescence in Wood's UV lamp...
  • Improvement Action Network (IAN) Clostridium Difficile Virtual Session

    Improvement Action Network (IAN) Clostridium Difficile Virtual Session

    Multiple survey methods showed there was a gap in employee understanding of the process to report adverse reactions to Hand Hygiene. This process is now included in the training. To promote Hand Hygiene messaging and processes, Project Executive handed out...