Strait Richmond Hospital Development of Ambulatory Care Unit & Redesign of Emergency Department Proposed Renovations 05/05/18 BACKGROUND Current Building - Circa 1980 Facility has been well maintained but has undergone minimal renovations since initial construction A number of deficits identified Identified the need to: Define the priorities Explore options to address Explore preliminary costing PRIORITY AREAS

VISITING SPECIALTY CLINICS AMBULATORY CARE I. Lack dedicated exam space for visiting clinics I. Visiting specialty physician clinics must utilize space within the ED. II. Results in conflicts with space availability to accommodate these clinics due to: I. The variability/unpredictability in the

number of patient visits to the ED on a daily basis II. An inpatient occupancy rate running 100% or > resulting in I. 2016-17 there were 10, 549 ER visits and 1742 Clinical visits. III. Clinic visits-patients coming for dressing change, IV meds etc. from home now wait with Emergency patients. With Ambulatory Care space appointments would be made and limit wait times significantly. PATIENT WASHROOMS I.

No washroom directly accessible within the Emergency Department (ED) II. Patients must leave the ED to use the facilities I. Staff may need to leave the ED to accompany patients requiring support II. Patients may be left unattended if the staff member is required in the ED III. Current washrooms are neither wheelchair accessible nor bariatric

friendly TRIAGE I. Triage not located within the Emergency Department II. Does not support the concept of Nurse First . The Nova Scotia Emergency Care Standards note that a trained health-care provider should initially assess patients with a perceived medical, surgical, or mental health emergency as soon as possible. III. The Standard for Health Care

Facilities notes the location of triage should allow for the fastest identification of emergency patients by the medical team, as opposed to registration prior to seeing a triage nurse/healthcare provider. IV. Staff must leave the ED to attend to patients entering the facility. I. ED CARE TEAM WORKSTATION Nurses spend a significant amount of time at the nursing station documenting and coordinating care. Studies indicate the nature of the work environment can have a

significant impact on the job satisfaction of nurses II. The design no longer supports functionality: I. Provision of a collaborative environment supportive of multi-disciplinary teams II. Changing technologies (e.g., enhanced computerization, electronic devices, etc.) III. Lack of an ergonomic workspace IV. Lack of wheelchair accessible greeting counter for both patients and visitors V. A lack of lighting VI. Congested desk space, crowded, narrow space

VII. Inadequate supplies storage area VIII.Lack of easy access to an ice machine INPATIENT NURSING STATION I. Similar to the ED, the finishes and design intent of the area are reflective of the 1980s and no longer supports current Lack of access to a dedicated hand wash sink II. Inability to disinfect many of the vertical surfaces (wood construction, finish has worn off), cracks etc. along the edges (unable to

clean; risk of splinters, damage to clothes, etc.) III. Cracks/separation in flooring (infection control concerns and potential tripping hazard) IV. Lack of an ergonomic workspace V. Lack of wheelchair accessible greeting counter VI. Lack of ability to filter the sunlight from the 2 skylights, coupled with no air conditioning, resulting in high Temperatures (in particular during the summer season) VII. A lack of task lighting VIII.Congested desk space PROCESS

With the issues and priorities identified: Received funding support to engage a design team to provide design consulting services and Class C estimate Request for fee proposals issued and work awarded to Archibald & Fraser Architect Ltd. April 12, 2017 Several design meetings held to review options Preliminary design completed Oct 2017 PRELIMINARY DESIGN PRELIMINARY DESIGN Goals To address the priority areas of concern To repurpose underutilized Lab space Address infection control concerns To provide information to support preliminary cost estimating. To look at impact of construction on operations

How can we complete the work and maintain service to our patients? End Results Development of an Ambulatory Care Space that accommodates current clinics and attract future services. Meet the Nova Scotia Emergency Care Standards (2010) and the CSA Standard for Health Care Facilities for e-triage Improve flow in the Emergency Unit to improve current wait times. Provide washrooms that are accessible within the Emergency Department and are wheelchair friendly. Providing a divide between sick patients awaiting Emergency Services and Clinic patients who are well but vulnerable. Improve work space. Improve security for staff and patients utilizing the Emergency Department. Freeing the DI registration space to facilitate the renovations.

Renovation to expand the existing registration area to allow for consolidation of all registration functions thus Where are we now? Obtained approval in principle from NSHA. Private Donor has come forward to the Strait Richmond Hospital Foundation with financial assistance to support the development of the Ambulatory Care space phase of the project. Foundation has agreed to match donation of the private donor. In discussion with another potential donor. Optimistic that NSHA will contribute financially to the project but awaiting budget approval. A signed financial agreement between NSHA and Foundation will need to be formally signed before request for fee proposals can be issued for final design and construction. INITIAL PROJECT COST ESTIMATE

Item Design Estimate Preliminary Design $ Detailed Design/Construction Support $ Notes - 140,000 Construction Construction

$ 1,400,000 FF&E Equipment/Furniture $ 100,000 Transition Moves $

70,000 Subtotal A Project Contingency $ 1,710,000 $ 513,000 Subtotal B $

2,223,000 Tax Burden $ 56,687 PROJECT TOTAL $ 2,279,687 * Exclusive of Escalation Complete

At 10% of construction cost Class C Estimate At 5% of construction cost At 30% At 2.55% Projected Ambulatory Care Funding We have received a $300,000.00 donation towards the development of a Ambulatory Care Unit. Initial Estimate of project: Total square footage = 1,220 Based on the Class C estimate of ~ $200/square foot, construction costs are estimated to be ~$244,000 (a contingency factor as per industry

standard of 35% = $85,400) Minimum Cost: $329,000 This does NOT include TAX burden, nor does it include anticipated costs for completion of design and preparation of construction drawings. NEXT PRIORITY.. Determine Scope related to currently available funding. NSHA to develop phasing plan as funding becomes available.

Foundation will continue to fundraise to see project to completion. Foundation seeking partners in the community to help with the fundraising efforts. Foundation will provide information session to the community on their fund raising efforts.

Recently Viewed Presentations

  • Vocabulary - Augusta County Public Schools

    Vocabulary - Augusta County Public Schools

    Vocabulary - Notes. Denotation - It is a word's strict dictionary meaning.. Connotation - It is the tone of a word - the emotions and associations you make with a word when you hear or read it.
  • Preservation in Digital Libraries - Rutgers University

    Preservation in Digital Libraries - Rutgers University

    Digital Preservation - Outline Introduction - Definitions, Facts, Challenges Digital Archiving - A Life Cycle View Metadata Strategies RUL Projects
  • Live Mobile and Cloud Hacking by ACEs

    Live Mobile and Cloud Hacking by ACEs

    Live Mobile and Cloud Hacking by ACEs. OGh | Fusion Middleware Experience (FME) 16-feb-2016. 14:45 - 16:45. Want to know more about Oracle's Cloud products and how they work together and can be integrated into enterprise solutions?
  • Knox County Schools Social Studies Department

    Knox County Schools Social Studies Department

    look-fors in the social studies classroom. Collecting data and information from . a variety of primary and secondary sources. Critically examining a primary or secondary source. Synthesizing . data from . a variety of sources . Constructing and communicating ....
  • Slide 1

    Slide 1

    1. The Middle Colonies had a climate of tolerance. 2. Supporting Reasons a. Diverse population made it difficult for any single group to dominate others B. Supporting Opinions Fill in the chart to explain why many people in the Middle...
  • Powerpoint template for scientific posters (Swarthmore College)

    Powerpoint template for scientific posters (Swarthmore College)

    Trials were made for various free stream velocities using bedload thicknesses of 0.1, 0.3. 0.6, 1.0 and 2.0 cm. When "measuring" combined bedload and suspended load transport, the comparisons show excellent agreement as shown by the blue symbols in Figure...
  • Canadian Auto Industry before and after the Great Recession ...

    Canadian Auto Industry before and after the Great Recession ...

    Context. The auto industry in Canada is a major and strategic industry. 14.8% of all Canadian exportations in 2012 (97.8% go to the US). In 2016, the sector represented 10.88% of the manufacturing GDP.
  • Prevention of Sexual Harassment Definition of Sexual Harassment

    Prevention of Sexual Harassment Definition of Sexual Harassment

    This assistance includes access to legal counsel, EOAs, the Navy EO/SH Adviceline, and the NAVINSGEN, fraud, waste, and abuse hotline. Ensure EO complaint procedures are effective and timely. Ensure detailed SITREPS are sent upon receipt of a formal complaint and...