Oroville Dam Complex Sagas Miscues, Regulator Mistakes, and

Oroville Dam Complex Sagas Miscues, Regulator Mistakes, and

Oroville Dam Complex Sagas Miscues, Regulator Mistakes, and Reflections on Where Weve Been and the Mysteries of Where We Are Going? California Rivers Day Legislative Briefing State Capitol, May 3, 2017 Presented by Ron Stork, Friends of the River

Some Geography More Geography Oroville Dam Factlets 3.5 million acre-feet keystone of the State Water Project currently undergoing relicensing. 750,000 acre-feet flood space reservati0n, 150,000 acrefeet surcharge reservation 17,000 cfs powerhouse; 5,000 cfs river outlets

296,000 cfs main service spillway (at spillway design flood) 350,000 cfs auxiliary/emergency spillway (as above) Operated according to 1970 ACE reservoir 1997 Floods Record Oroville Dam inflow (300,000 cfs) Record outflow (160,000 cfs) (hourly data)

City of Oroville told to stand by to evacuate in twelve hours if DWR has to begin pass-through (300,000 cfs) operation. Downstream communities evacuated. However, reservoir storage peaked 200,000 acre-feet (13.8 ft), well below emergency/auxiliary spillway crest. Feather River left-bank levee breaks downstream of Marysville (Country Club Lane Break).

Response Yuba Feather WorkGroup forms (funded by CALFED) by 2000 Focus: improving floodwater management in Feather River Basin Most active participants: Yuba County Water Agency, Sutter County, Levee District 1, South Yuba River Citizens League, Friends of the River, Sierra Club, DWR. Deficiencies with Oroville Dams emergency/auxiliary spillway are frequent part of discussions. Concern is that general havoc (hillside erosion) will prevent

operators from undertaking Corps-manual surcharge operations to contain combined spillway outflows within downstream levees when required. Further, use could result in loss of crest control. That would be bad. Solution: a real spillway. Lack of Response and Counter Response Written analysis of spillway deficiencies made available to DWR date back to August 23, 2001.

Yuba County Water Agency publishes August 2002 Technical Memorandum describing, in part, havoc associated with use of emergency spillway. Detailed discussions with DWR FERC-licensing staff take place in 2002 through 2004. DWR takes position the spillway matter is not appropriate for a relicensing proceeding. Workgroup members believe otherwise. In January of 2004, WorkGroup informs DWR that it recognizes stalemate and informs DWR that stakeholders will bring the matter to FERC licensing proceeding. FOR files comments in June 2004 with FERC objecting to DWRs position.

In October 2005, FOR/SYRCL/Sierra Club Intervene citing YCWA technical memorandum plus concern that use could result in loss of crest control. Sutter County, Yuba City, and Levee District 1 file for intervention later also raising these issues. FOR et al. argue operational requirements of dam are not supported by the physical structures (i.e. emergency spillway). Hiding the Ball or Self-Decption? FERC Licensing in DC asks FERC Dam Safety in San Francisco what they think of

Intervention issues (May 26, 2006) DWR assures FERC Dam Safety that emergency spillway can safely pass spillway design flow (350,000 cfs). Speaks of only 1 to 4 feet of erodible soil on hillside. Bypassing the operational issues of problems with use of emergency/auxiliary spillway, FERC SF Dam Safety assures FERC licensing staff the emergency/auxiliary spillway can safely pass spillway design flood. (July 27, 2006) Conclusion document from FERC SF Dam Safety is only document made available.

Any work (if any) supporting the conclusions is secret (CEII). FERC licensing accepts SF FERC Dam Safety conclusions and fails to propose any spillway improvements at Oroville Dam but does accept our description of DWRs ACE operational requirements. (2006) SWRCB issues water quality certification (2010) 2017 Spillway Incident

Oroville Incident Reservoir Levels Oroville Incident Outflows Oroville Incident Flow Synthesis Havoc

More Havoc More Havoc Using the Auxiliary Spillway would be a bad thing, perhaps very bad Actual fear was loss of hilltop

crest control and catastrophic release of top of reservoir. The threat to the dam structure itself would require considerable hillside failure,

probably only a remote possibility From Bad to Worse The Temperance Flat Dam will flood: 8 miles of the San Joaquin River Gorge a river recommended by the BLM for

National Wild & Scenic River protection. A BLM recreation area visited by 84,000 people annually Three campgrounds, an outdoor education center and natural history museum Segments of San Joaquin River National

Recreation Trail and two other National Trails And Near Catastrophe Imminent Failure, Day After Imminent Failure, Day After

All outlets compromised Short-term Recovery Actions Dredging out Oroville Dam afterbay to relieve pressure on powerplant and enable restart Rerouting powerlines to avoid danger zones and keep powerplant on line. Reroute major PG&E transmission line Stabilize auxiliary/emergency spillway hilltop Shorterm stabilization of dangerous erosion features to

main spillway Next One or Two Construction Seasons Stabilize and reconstruct the main spillway Construct spillway on emergency/auxiliary hilltop (without hillside spillway still an incomplete spillway causing havoc if used) Potentially permanently rerouting powerlines to

avoid danger zones and keep powerplant on line. Redundant powerlines Following Construction Seasons Construct full spillway to prevent severe hillside erosion if used. (Without explicitly stating so, as of this writing DWR apparently has rejected this necessary fix.)

Ensure that radial gates have sufficiently redundant power. (Not sure this will be assessed for need or undertaken since Bulletin 200 description may not represent current conditions.) Find a way to increase reliability and capacity of low level outlets and powerhouse releases and increase their capacity (Relying on powerhouses to reliably make reservoir regulation releases can be tricky business.)

Consider construction of a lower-level outlet/spillway capable of making releases in advance of extreme storm inflow.s (Although Orovilles low-level flood-release capabilities arent bad, they may need to be improved if a complete emergency spillway option is selected and the surcharge flood reservation has to be transferred to the conservation pool.) Identify and fix other identified problems that may threaten the infrastructure and the operability of the Oroville Dam complex (for example, there may be some through-dam seepage that may need attention)

Forensic Investigation FERC Dam Safety has asked DWR to conduct a study to determine the cause of the spillway failures Much of DWR and FERCs in-progress thinking is behind a veil of CEII secrecy. DWR has proposed to make the report public (although parts will be redacted) It is unclear if the review will determine the causes of DWR and State and Federal Dam Safety officials failure to discover

or appreciate havoc-causing or dam-safety issues during design, life of project, or licensing review. This may involve sociologic factors Major Unresolved Problems Likely resistance of State Water Contractors to paying the bill for reconstruction and appropriate levels of maintenance DWR and Dam Safety Regulators view that emergency/auxiliary spillway use or operational need is

extremely unlikely (even to 1/10,000 or 1/100,000 annual risk levels, although Oroville has either been told to evacuate or evacuated twice in life of project because of feared use) Much of DWR and FERCs in-progress thinking on forensics and design is behind a veil of CEII secrecy. DWR has proposed to make the forensics report public (although parts will be redacted)

Major Consequences Veil of secrecy prevents public from informed consultation with DWR and FERC on reconstruction and making the Oroville Dam complex safe decisions DWR, state and federal dam safety officials, and FERC licensing appear to have no concept that havoccausing or unsafe emergency/auxiliary spillway design defeats the likelihood of ACE-required managed floodwater-management surcharge releases from the dam. The result: decreased flood protection for

downstream communities Solutions This incident highlighted a major failure of dam-safety regulators (state and federal). This should be a major focus of at least one influential forensics report. The report(s) should recommend reforms and they should be adopted Contracts with state water contractors should cover costs of ongoing maintenance and addressing design deficiencies that affect

project operations, safety, reliability or other necessary programs. DWR and Federal regulators need to quickly construct a more reasonably transparent Oroville Dam complex reconstruction and rehabilitation process that allows an informed public to affect design decisions now being undertaken in considerable secrecy (this might not have been necessary if DWR and the State Water Contractors had not fought off reconstruction and rehab during relicensing) Final Reflections

Dams, although much praised for their functions, are also dangerous. The legislature and water agencies should be more cautious about authorizing or funding them just assuming that dam-safety and environmental decisions will be made responsibly. The failures at Oroville should have been caught during design, through dam safety reviews, during contract reviews, during relicensing, and even the 2017 process. The werent in the past, and some appear not to be heading for a satisfactory conclusion either in 2017 or in the coming years.

The Oroville Dam Spillway incident drew worldwide press. California and FERC need to understand that they need to resolve all of the deficiencies, both physical and institutional, if we are to be viewed as the world leader we aspire to be. On the transparency front, it is not an auspicious start. Photo Credits San Jose Mercury News Associated Press

Department of Water Resources Wikipedia Sacramento Bee Dave Gutierrez, GEI Consultants, recently retired chief of the DWR Division of Safety of Dams Los Angeles Times San Francisco Chronicle Washington Post (It should be noted that some of these photographers headed into the evacuation zone,

risking their lives to get the story.) For more information, contact: Ron Stork Policy Director Friends of the River Phone: (916) 442-3155 x220 Email: [email protected] For some of this information, visit the Oroville

Dam page at www.friendsoftheriver.org http://www.friendsoftheriver.org/our-work/river s-under-threat/feather-threat /

Recently Viewed Presentations

  • Organization of Programming Languages

    Organization of Programming Languages

    Why study Programming Languages? Increase your capacity to express ideas (both programming and in general) Increase your ability to select a PL for a specific use
  • Ecosystem Interactions

    Ecosystem Interactions

    Largest Estuary in the U.S. (3rd largest in the world) ... FOOD CHAIN - list of food . from the producer to the . final consumer. WHAT IS A WEB? -Interwoven pattern.-complicated relationship. FOOD WEB - all of the interrelated...
  • DSS Chapter 1

    DSS Chapter 1

    Hive Pig Hbase Flume Oozie Ambari Avro Mahout, Sqoop, Hcatalog, …. Big Data Technologies MapReduce MapReduce distributes the processing of very large multi-structured data files across a large cluster of ordinary machines/processors Goal - achieving high performance with "simple" computers...
  • LAPORAN ANUGERAH KUALITI PERKHIDMATAN PEJABAT PENDAFTAR UTM KUALA

    LAPORAN ANUGERAH KUALITI PERKHIDMATAN PEJABAT PENDAFTAR UTM KUALA

    PENGENALAN. UTM Kuala Lumpur (UTMKL) mempunyai keluasan 18 hektar (47 ekar) terletak di Jalan Sultan Yahya Petra, berada pada lokasi yang amat strategik ditengah Bandaraya Kuala Lumpur.. Kampus induk . UTM telah berpindah ke Skudai, Johor pada tahun 1989 dan...
  • Aleutian Islands 3 June 1942--24 August 1943 A

    Aleutian Islands 3 June 1942--24 August 1943 A

    The Potsdam Declaration took place on July 26, 1945. Don't be confused with the Potsdam Agreement, because that was something very different. The Potsdam Declaration was made by Harry S. Truman, Winston Churchill, and Chiang Kai-Shek and it basically outlined...
  • Parts of Speech - Mrs. Watkins

    Parts of Speech - Mrs. Watkins

    monologue for Mrs. Smith because the extra credit . points will help them improve their averages at . the end of the semester. The students. him or her. his or her. No change is necessary. Everyone. should memorize a Shakespeare...
  • Ethics in engineering and product design

    Ethics in engineering and product design

    Helpdesk - 1810 enquiries from community organisations . 3000 plus students involved in community projects as part of study. 121 community knowledge exchange partnership projects funded - involving 533 project partners. A dozen active communities of practice (for example: deaf...
  • Writing Professional Emails - Philadelphia University

    Writing Professional Emails - Philadelphia University

    Email. An Email: is a message distributed by electronic means from one computer user to one or more recipients via a network. Emails could be used for personal purposes to communicate with friends and family, but their importance raises from...