Last Edited on 7/30/2018 Proposed NPRR 863 Ancillary

Last Edited on 7/30/2018 Proposed NPRR 863 Ancillary

Last Edited on 7/30/2018 Proposed NPRR 863 Ancillary Service Framework Changes NPRR 863 WITH STEC COMMENTS (4/26, 8/2) CURRENT FRAMEWORK REGULATION REGULATION 157 to 687 MW* 157 to 687 MW* RESPONSIVE RESERVE SERVICE 1. Primary Frequency Response 2. Load Resources on Under Frequency Relay (UFR) 3. 10 minute ramp 2,300 to 3,200 MW* No Change FREQUENCY RESPONSE SERVICE (FRS) FFR Triggered at 59.85 Hz and full response in 15 cycles Once deployed, sustain for up to 15 mins. Once recalled, restore within 15 mins Fast Frequency Response (FFR) PFR PFR capable capacity reserved on generators or Controllable Load Resources (CLR) Minimum 1,150 MW must be provided by resources capable of PFR Load Resources on UFR Primary Frequency Response (PFR) 2,300 to 3,200 MW* ERCOT CONTINGENCY RESERVE SERVICE (ECRS) 10 minute ramp Load Resources may or may not be on UFR Load Resources on UFR Triggered at 59.70 Hz and full response in 30 cycles Sustain until recalled. Once recalled, restore within 3 hours Beyond the minimum PFR, up to 60% of total FRS can come from Load Resources on UFR or FFR. Generation Online or offline capacity that can be converted to energy within 10 minutes Dispatched by SCED Load Resources (UFR not required) Up to 50% of ECRS capacity can come from Load Resources with or without UFR Once deployed, must respond within 10 minutes. Restoration within 3 hours 508 to 1,644 MW** NON-SPIN NON-SPIN 967 to 2,361 MW* 0 to 1,180 MW*** Overall A/S: 3,807 to 5,958 MW* PUBLIC No protocol changes. Proposed methodology for Non-Spin Reserve Service quantities in this framework quantities computed using 2018 A/S Methodology are reduced by ECRS quantities. Overall A/S: 3,807 to 5,958 MW* *Quantities computed/estimated using 2018 Ancillary Service Methodology. **Quantities estimated using this reference. ***Quantities estimated using this reference and method in box on far left. For Discussion Purposes Only. The intent of this slide is to represent NPRR 863 (with ERCOT comments from 7/6/2018). Protocol language prevails to the extent of any inconsistency with this one page summary. 1 1 Last Edited on /16/2018

Proposed NPRR 863 Ancillary Service Framework Changes NPRR 863 WITH STEC COMMENTS (4/26, 8/2) AND ERCOT STEEL SUGGESTIONS CURRENT FRAMEWORK REGULATION REGULATION 157 to 687 MW* 157 to 687 MW* RESPONSIVE RESERVE SERVICE 1. Primary Frequency Response 2. Load Resources on Under Frequency Relay (UFR) 3. 10 minute ramp 2,300 to 3,200 MW* RESPONSIVE RESERVE SERVICE (RRS) FFR Triggered at 59.85 Hz and full response in 15 cycles Once deployed, sustain for up to 15 mins. Once recalled, restore within 15 mins Fast Frequency Response (FFR) PFR PFR capable capacity reserved on generators or Controllable Load Resources (CLR) Minimum 1,150 MW must be provided by resources capable of PFR Load Resources on UFR Primary Frequency Response (PFR) 2,300 to 3,200 MW* ERCOT CONTINGENCY RESERVE SERVICE (ECRS) 10 minute ramp NON-SPIN 967 to 2,361 MW* Load Resources may or may not be on UFR PUBLIC Load Resources on UFR Triggered at 59.70 Hz and full response in 30 cycles Sustain until recalled. Once recalled, restore within 3 hours Beyond the minimum PFR, up to 60% of total FRS can come from Load Resources on UFR or FFR. Generation Online or offline capacity that can be converted to energy within 10 minutes Dispatched by SCED Load Resources (UFR not required) Up to 50% of ECRS capacity can come from Load Resources with or without UFR Once deployed, must respond within 10 minutes. Restoration within 3 hours 508 to 1,644 MW** NON-SPIN 0 to 1,180 MW* Overall A/S: 3,807 to 5,958 MW* No Change No protocol changes. Proposed methodology for Non-Spin Reserve Service quantities in this framework quantities computed using 2018 A/S Methodology are reduced by ECRS quantities. Overall A/S: 3,807 to 5,958 MW* *Quantities computed/estimated using 2018 Ancillary Service Methodology. **Quantities estimated using this reference. For Discussion Purposes Only. The intent of this slide is to represent NPRR 863 (with ERCOT comments from 7/6/2018). Protocol language prevails to the extent of any inconsistency with this one page summary. 2 2

Recently Viewed Presentations

  • Nanoscale Lithography, Techniques and Technology

    Nanoscale Lithography, Techniques and Technology

    Nanoscale Lithography. Nanolithography is the branch of nanotechnology concerned with the study and application of fabricating nanometer-scale structures, meaning patterns with at least one lateral dimension between 1 and 100 nm.
  • Word List: pre

    Word List: pre

    Marie Curie. a scientist who won two Nobel prizes in the early 1900s for her work with radioactivity. physical science. the study of matter and energy. ... constant. factor in an experiment that stays the same. independent variable. independent variable.
  • Chapter 20 PN Junction Diodes Objectives  After completing

    Chapter 20 PN Junction Diodes Objectives After completing

    Chapter 20 PN Junction Diodes Objectives After completing this chapter, you will be able to: Describe what a junction diode is and how it is made Define depletion region and barrier voltage Explain the difference between forward bias and reverse...
  • Herramientas Tic Para El Comentario De Textos En Secundaria

    Herramientas Tic Para El Comentario De Textos En Secundaria

    Página oficial del programa Tipo de actividades Tutorial sobre el programa Muestras (1, 2, )‏ Jclic Creación de actividades en formato Java Página oficial Actividades de texto Muestras (1, 2)‏ Herramientas online Webquest Blog Wiki Aula virtual: moodle / Helvia...
  • CSCI 204 Introduction to Computer Science II

    CSCI 204 Introduction to Computer Science II

    Entities of a weak entity set can not be determined alone. Entity set E is said to be . weak. if, in order to identify entities of E uniquely, we need to: follow one or more many-one relationships . from....
  • Facebook for Libraries & Networks

    Facebook for Libraries & Networks

    Thus, he decided instead on building a wall. Hadrian Unlike the Germanic limes, built of wood palisades, the lack of suitable wood in the area required a stone construction [27]; nevertheless, the Western third of the wall, from modern-day Carlisle...
  • Leading the ASYE forward In this workshop today:

    Leading the ASYE forward In this workshop today:

    Leading the ASYE forward Thank you * In this workshop today: Lyn Romeo, the Chief Social Worker for adults Summarising how the ASYE is changing in line with the Knowledge and Skills Statement How social workers provide leadership, assessment and...
  • Marketing Management, 15e

    Marketing Management, 15e

    Nielsen Claritas has developed a geoclustering approach called PRIZM (Potential Rating Index by Zip Markets) NE that classifies more than half a million U.S. residential neighborhoods into 14 distinct groups and 66 distinct lifestyle segments called PRIZM Clusters. The groupings...