PRODUCT UPDATES - Todd's IT

PRODUCT UPDATES - Todd's IT

PRODUCT UPDATES LIGHT COMMERCIAL 2014 TSA Meeting UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further HGRH UNITS SCHRADER VALVE Issue description: Units from CMX-C had Schrader cores that did not allow the TXV to operate. Containment at the factory made on August 28, 2013 Corrective action - Change assembly design, eliminate nut of the TXV Valve assembly and

eliminate coremax on the tubing. Design change made to brazed in equalizer line. Units built after February 7th will have this change implemented. Clean Point SN C140689853 UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further SRT and MRT Gas Valves Issue Description: Gas valves failing stuck open or stuck closed Root Cause:

appears to be moisture infiltration causing shorting of the circuit board located under the cap of the gas valve. Preliminary findings show that on the SRT chassis 2 a plug is installed on the unit top. The plug is used to seal a screw hole that is used on chassis 1 units. This plug may be missing. UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further SRT and MRT Gas Valves Root cause and containment: SRT chassis 2 found in inventory with missing plug.

SRT chassis 1 showing cocked (misaligned) screws in top Both occurrences are the leading cause of water infiltrating the burner section and causing the gas valve failures. Quality alert implemented at factory on January 18 2014 to warn the operator for correct assembly of plastic plug and screws on Top. Gas valves were added to the Special Request Parts return list for vendor analysis Nov. 4, 2014. Design team is looking for the best option to eliminate the water filtration. Validate new parts.

UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further SRT and MRT Gas Valves Corrective actions: New seal strip in place New method for routing cables Changes implemented Week C1416 UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further SRT and MRT WATER LEAKS Issue description: Water leaks through the hinged

panels causing damage in the building. Containment: Factory Quality alert implemented on November 26, 2013 Root cause: Missing gasket in brackets Wrong position of gasket in unit Wrong position of aluminum plate on unit. UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further SRT and MRT WATER LEAKS Corrective actions: Factory modified operator

standard work instructions and evaluate with Process check list to assure correct placement of gaskets Rain test validation in a Unit every 4 months. Corrective actions implemented on February 25, 2014 UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further CMX-C Water Leaks SRT,MRT Units Issue description: Units are leaking water into the return

air section Containment: Ensure silicone application in the bottom of the evaporator coil. Ensure silicone application in the holes between compressor plate and base pan. Root cause: Lack of or missing silicone Corrective actions: Apply seal strip instead of silicon between base pan assembly, design team is making a rain test for validation of this change. Changes are in process.

UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further SRT UNITS WRONG LABELS APPLIED Issue description: Label 208V-230V placed in 460V units . Root cause: Manufacturing operator error due to standard work instructions not being clear when not to use the label. Corrective actions: Proper training of staff on modified standard work instructions. Add this Label to the unit BOM.

Changes implemented on February 25, 2014 UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further 9 CMX-C Flame Retainer Issue description: Burner with Flame retainer incorrect. 2 Holes instead of 3.Sensors on burner were damaged due excessive heat. Containment: Operator is validating with a mark the correct Retainer assembled on

unit. Quality alert issued at the factory UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further CMX-C Flame Retainer Root cause: Design Issue allows for use of the wrong retainer. Corrective actions:

Mfg. is working with the flame retainer die to find the best position of screw holes in each part number. modify the vestibule plate to match with new retainers. Target for April1,2014 Setup selection for press shop will be monitored by checklist. And go no go fixture. Target is May 1, 2014 UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further TITLE 24 COMPLIANCE

Title 24 is a California Building Energy Efficiency Standards Code. For ICP, Title 24 compliance pertains to the efficient design and operation of HVAC equipment. Applicable equipment that is to be sold in California in July2014 must comply with this standard. Specific Title 24 compliant functions include: Dual Minimum Economizer Positions, based on fan speed/airflow Pre-Occupancy Purge Demand Control Ventilation Occupancy Sensor Ventilation/Setback, which widens the occupied set points when the space is unoccupied Heat Pump Aux Heat Control, which only allows auxiliary heating operation

when it is necessary Economizer Fault Detection and Diagnostics Fault detection - performance based UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further Economizer (FDD) Fault Detection and Diagnostics FDD example: UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further Title 24 Jade W7220 controller has all the FDD that meets the Title 24

compliance and new details will be coming soon. UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further Condensate Drain Pan Problem description: Drain pan breaks after installing tube due to dimensional problems with internal and external diameter of tubing hole Root cause: Uncontrolled process during production Corrective action:

sub supplier to run the process with the correct cool down time, as well as implement audits to check the parameters and size of the internal diameter. Implemented week 0414 UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further COMFORT ALERT DIAGNOSTICS Issue description: MODULE Comfort Alert Diagnostic Modules (CADM) are being misdiagnosed on system startups P/N 1179496 Products affected: CAS, CHS

Returned CADMs failure analysis report confirm no defect found (NDF) UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further RHS Heat Pump Factory Mis-wire First field report: RHS week 08/2013 Found the violet wire connected to the ODF contactor coil is connected to CLO2 at pin #7 on the CTB board. This causes the condenser fans to continue to run during the

defrost mode, thus resulting in partial icing of the coil UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further RHS Heat Pump Factory Mis-wire UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further RHS Heat Pump Mis-wire Root Cause: Assembly drawing error. Factory is working on new assembly drawing. Quality alert implemented

February 10, 2014 Marked with green tag on violet wire UTC Building & Industrial Systems Confidential & Proprietary Information Not for Further

Recently Viewed Presentations

  • Roman Catholic Sexual Ethics - Boston College

    Roman Catholic Sexual Ethics - Boston College

    Casti Connubii Pius XI, 1930Role of Husband and Wife. This order includes both the primacy of the husband with regard to the wife and children, the ready subjection of the wife and her willing obedience, which the Apostle commends in...
  • Snímek 1 - zsnastrani.cz

    Snímek 1 - zsnastrani.cz

    Renata už není jako bývala. Doplň . interpunkci, proveď . grafický rozbor . souvětí a . urči druhy vedlejších vět: Až ho potkám vyřídím mu co mu vzkazuješ. ... Tell me when you will return.
  • Lavender Ward Details - Carers Trust

    Lavender Ward Details - Carers Trust

    Lavender Ward Carers Lead . ... 60-90% of service users on Lavender had a carer recoded on RiO. ACRW pilot outcomes. 1st April - 31st January ie 10 months data. In addition to this recorded data the CRW has delivered...
  • Technologies Subgroup June 18, 2014

    Technologies Subgroup June 18, 2014

    Michael Barnett, Steve Snellers (Smart Cloud) Phil Powell (Dominion) Jeremy Tyree (Landis & Gyr) ... Becky Wingenroth (EPRI) Kelly Connell, Chris Graves, Brian Fisher (Staff) Mike Rieder, Peggie Neville, Mike Williams (Staff) ... Technologies Subgroup June 18, 2014
  • Mezinrodn ekonomie pednka .2 Produktivita prce a Ricardinsk

    Mezinrodn ekonomie pednka .2 Produktivita prce a Ricardinsk

    Mezinárodní ekonomie přednáška č.2 Produktivita práce a Ricardiánský model obchodu Struktura přednášky Úvod Teorie komparativních výhod Ekonomika s jedním VF Obchod v ekonomice s jedním VF Omyly a teorie komparativní výhody Komparativní výhoda a produkce více zboží Přidání dopravních nákladů...
  • Conjunctions and Conjunctive Adverbs

    Conjunctions and Conjunctive Adverbs

    CONJUNCTIONS AND CONJUNCTIVE ADVERBS In General Conjunctions have one job, To connect words, phrases, or clauses Their presence provides smooth transitions from one idea to another. Allows for varied sentence structure and to create clarity We've studied Coordinating conjunctions FANBOYS...
  • Grading the Extended Response - cbcpsychology

    Grading the Extended Response - cbcpsychology

    Grading the Extended Response. The median score = 5/10. The majority of students will score between 3 to 7. So how to I get above that? VCAA sample
  • CHAPTER 3 SCORING & MODERATION Strategies for scoring

    CHAPTER 3 SCORING & MODERATION Strategies for scoring

    More time consuming to score, should have clear and objective scoring rubrics. Extended constructed response. Less objective, should have clear and objective scoring rubrics, more time consuming to score. Scoring For Different Item Types. Scoring is an activity to assign...