Upgrading Clinical Information Systems

Upgrading Clinical Information Systems

Implementing and Upgrading Clinical Information Systems Definition A Clinical Information System (CIS) is an information system designed to be used specifically in the critical care environment. It integrates the many computer systems found in a modern hospital, such as pathology and radiology, with an electronic patient record. Purpose of Clinical Information Systems Provide nurses knowledge of many aspects organized for effective and

efficient healthcare delivery. Assists clinicians with data necessary for decision-making and problem solving. Must serve the organization and the patient in much the same way an efficient healthcare delivery system involves all appropriate departments in establishing healthcare delivery processes. Major CIS requirements in Nursing Administer a nursing department Assist the management of nursing practice Assist nursing education

Support nursing research Clinical Information System can be designed as a stand-alone system, a subsystem of a larger system, or an integral part of the healthcare organizations overall information system. 8 phases of implementation Any CIS or single application design/ implementation or upgrade must complete the eight phases of implementation: 1. Planning 2. System analysis 3. System design / system selection

4. Development 5. Testing 6. Training 7. Implementation 8. Evaluation Planning Phase Begins once an organization has determined that an existing need or problem may be filled or solved by the development of a CIS.

Clinical Information System Committee Structure and Project Staff The nursing administrator, in conjunction with the information systems management team, works to develop a committee structure and participation to best guarantee the success of the project. Transition management is a series of deliberate, planned interventions undertaken to assure successful adaptation/ assimilation of a desired outcome into an organization. (Douglas and Wright, 2003). A three-tiered committee approach is recommended to accomplish the design, implementation, or upgrading of a complete CIS a steering committee, a project team, and departmental teams.

Clinical Information System Steering Committee Charged with providing oversight guidance to the selection and integration of a new CIS into the organization Generally includes representatives from the following areas: 1. Hospital administration/ hospital finance 2. Nursing administration 3. Medical staff 4. Information systems department at the director or manager level 5. Major ancillary department (laboratory, radiology, pharmacy, dietary, medical records/ patient

registration, patient accounting) 6. Health information management (medical records) 7. Legal affairs 8. Outside consultants (as needed) 9. Other appointed members (as needed) Project Team Led by an appointed project manager and includes a designated team leader for each of the major departments affected by the system selection, implementation, or upgrade proposed Objectives: 1. Understand the technology and its restrictions, if any, of a proposed system

2. Understand the impact of intradepartmental decisions 3. Make decisions at the intradepartmental level for the overall good of the CIS within the organization 4. Become the key resource for their application Goal: improve patient care Project manager: responsible for managing all aspects of the project; must have good communication, facilitation, organizational and motivational skills to be successful; must have fulltime dedication to a large-scale design or implementation project. Department Team Purpose of the departmental teams

1. 2. 3. 4. 5. 6. 7. To thoroughly understand the departments information needs To gain a full understanding of the softwares features and functions To merge the new systems capabilities with the departments operations

To assist in the system testing effort To participate in developing and conducting end-user education To provide a high level of support during the initial activation period of the new system Physician involvement early in the planning process is recommended to ensure understanding of the information needs of the medical staff relative to patient documentation. Planning In the American Society for Testing and Materials (ASTM) standards, the planning phase is referred as the project definition. Commercial software developers and consultant rank this phase as

the most critical factor in the selection of a system, even more important than the system itself. This phase is critical whether a system is actually being developed or existing commercial systems are being evaluated for selection. Steps in planning Definition of the Problem - Includes a description of how the system will be evaluated. - May also include increased processing capabilities, saving in processing time, decreased costs, or increased personnel productivity.

Steps in planning (1) Feasibility Study - Is the preliminary analysis to determine if the proposed problem can be solved by the implementation of a CIS or component application - Helps identify the information needs, objectives, and scope of the project - It highlights whether the proposed solution will produce usable products and whether the proposed systems benefits outweigh the costs. - Includes a high-level description of the human resources required and how the selected system will be developed, utilized, and implemented - Describes the management controls to be established for obtaining administrative, financial and technical approvals to proceed with each phase

of the project Steps in planning (2) - Includes the following topic areas: o Statement of objectives constitute the purpose/s of the system; all objectives are outcome-oriented and are stated in measurable terms o Environmental assessment defined in terms of the support it provides to both the mission and the strategic plans of the organization o Determination of the program needs/ needs assessment outlines the high-level information required by the users o Determination of the Scope establishes system constraints and

outlines what the proposed system will and will not produce o Development of a project timeline/ project workplan providing an overview of the key milestone events of the project o Recommendations Steps in planning (3) Documentation and Negotiation of a Project Scope Agreement - Includes the scope of the project, the application level management requirements, the proposed activation strategy for implementing the CIS or application, and the technical management and personnel who will maintain the equipment

- Becomes the internal organization contract of the project - Defines the short and long term goals, establishes the criteria for evaluating the success of the project, and expands the workplan further. Steps in planning (4) Allocation of Resources - Last step in the planning phase is determining what resources are required to successfully complete the project scope agreement.

The Key Role of the Nurse Administrator The active involvement of the nurse executive is considered a critical success factor of any CIS implementation or upgrade. The System Analysis Phase Second phase of developing a CIS Is the fact finding phase Foundational to the actual system design Data Collection Collection of data reflecting the existing problem or goal.

Refining of the project scope agreement Creation of a Workflow Document 1. Assimilates data collected into logical sequencing of tasks and subtasks performed by the end users for each goal or problem area, it includes: - A list of assumptions about the process - A list of major tasks performed - A list of subtasks and steps accomplished 2. Sources: - Written documents, forms, and flow sheets - Policy and procedure manuals - Questionnaires

- Interviews - Observations Data Analysis Provides the data for development of an overview of the nursing problem and or stated goal defined in the project scope agreement Tools used: 1. Data flowchart 2. Grid chart 3. Decision table 4. Organizational chart

5. Model Data Review Focuses on resolving the problem and or attaining the goals defined in the feasibility study based on the best method or pathways derived from the workflow documents and the functional design. The careful analysis of end-user requirements and potential solutions has been proved to reduce the cost of design and implementation. Benefits Identification The overall anticipated benefits from the system are documented in

this step. The benefits reflect the resolution of the identified problem, formulated and stated in quantifiable terms. System Proposal Development The proposal is submitted to a projects steering committee for review and approval The system document should answer these four questions: 1. What are the major problems and or goals under consideration? 2. How will the proposed CIS solution correct or eliminate the problems and or accomplish the stated goals? 3. What are the anticipated costs? 4. How long will it take?

Format should be: 1. 2. 3. 4. 5. 6. 7. A concise statement of the problems and or goals Background info related to problem

Environmental factors related to the problem Anticipated benefits Proposed solutions Budgetary and resource requirements Project time table System Proposal Development (1) Format should be: 1. 2. 3.

4. 5. 6. 7. A concise statement of the problems and or goals Background info related to problem Environmental factors related to the problem Anticipated benefits Proposed solutions Budgetary and resource requirements

Project time table The System Design Phase Functional Specifications Uses the functional design document developed in the system analysis phase of a CIS and builds on the design by forumulating a detailed description of all system inputs, outputs, and processing logic required. Technical Specifications The technical personnel work closely with the project and departmental teams to

ensure the technical components of the proposed system work in concert with technology and end-user needs and to assist in the development and implementation plan Technical Manager- He is required for the coordination of efforts in for major areas: Hardware Application Software Interface Systems Conversions Implementation Planning The last step; it is to establish a detailed implementation plan.

The implementation work plan should entail the following info: 1. 2. 3. 4. 5. 6. 7. 8. Personnel

Timeframes Costs and budgets Facilities and equipment required Development or Implementation tasks Operational considerations Human-computer interactions System test plan The Testing Phase The system, whether newly developed or commercially available, must be tested to ensure that all data are processed correctly and the

outputs are generated. Testing verifies that the computer programs are written correctly and ensures that when implemented in the production environment, the system will function as planned. The Testing Phase (1) When commercially available software is being implemented, three levels of testing are recommended. The first level is often called a function test. During this round of testing, the departmental teams and verify the database, ensuring that correct data have been entered into the files and table. The expected departmental reports are reviewed to assure correctness and accuracy.

Multiple interaction of functional test often occurs until the department team is confident about the system profile and setup. As more users interact with the new system, previous unfound problem may surface. Evaluation of the severity of the newly discovered problems and the corrective action required is an ongoing process during implementation The Document System Preparation of documents to describe the system for all users is an ongoing activity, which development of the documentation occurring as the various system phases and steps are completed. Documentation should begin with the final system proposal. Several manuals are

prepared: a users manual, a reference manual, and an operators maintenance manual. These manual provides guides to the system components and outline how the entire system has been programmed or define. User Manual Users manual highlights how to use the system and describes what outputs the system can produce. With commercially available software, the vendors users manual helps establish the organizations training manual.

Reference Manual Reference manual is used by the project team members to understand how the system works. It describes what data are input, how the data base process the data, and the mechanism used to generate outputs. Operators Maintenance Manual Enables operators to keep the system up and running by providing the functional and technical specifications needed for the system. Manual must be written in sufficient detail such that users and operators understand how the system was developed, how it operates, and how

it can be maintained, updated, and repaired. The Training Phase Is essential to train the end user on how to use the system properly. A CIS will function only as well as its users understand its operation and the operation streamline the work. All users of the new system or application must receive training. Training takes place before and during the activation of a new system. After system implementation, refresher of a new system. Training Is most effective when hands on instruction is provided. Training guides or manuals explain the system. Training takes place before and during the activation of a new system. After system implementation, refresher courses as well as new employee introductory training on the

use of the new systems are often provided by the institution. Training is more effective when on hands on, interactive instruction us provided. Training guides or manuals explain the system; however, retention of the information are increased if the learners are able to interact. The Implementation Phase Organizes all the steps into a detailed plan describing the series of events into detailed plan describing the series of events required to begin using the system or application in the production or live environment and details the necessary computer and software. Four activation approaches are possible: (1) parallel, (2) pilot, (3)

phased-in, (4) big bang theory. The timing of the conversation activity and the activation of all interphase require particular coordination between the technical staff and the project terms. The Evaluation Phase Describes and assesses, in detail, the new systems performance. Using the criteria established in the planning and system design phase. To evaluate an implemented hospital information system, many principles are important for CIS. One authority suggests evaluating duplication of efforts and data entry. Evaluating the system is the final and ongoing step in implementing process. This

evaluation component becomes a continuous phase. The system is assessed to determine whether it continues to meet the needs of the users. The totally implemented system will require continues evaluation to determine if upgrading is appropriate. The formal evaluation should be conducted by an outside evaluation team to increase the objective level of the finding. Informal evaluations are done on a weekly basis. Cost Benefits Analysis It is necessary to determine if the system is worth its price. The cost can change if it relates to the system cost and benefit to system design, level of use, timeframe and equipment costs. Each of these costs must

be assessed in relation to benefits derived. Such as evaluation can be helped determining the future of the system. Upgrading Clinical Information Systems May be undertaken for a number of reasons. Software vendors often provide enhancements and upgrades to their system. New application features may be developed by the vendor and become available to the organization. Upgrading a system as a result of the addition of a new subsystems and technology often occurs. However when upgrading, require close evaluation. New technologies are an important consideration; the following new technologies may be considered: 1. 2.

3. 4. 5. 6. 7. 8. 9. bedside/point of care wireless device workstation multimedia presentation

decision support artificial intelligence neutral networks integrated system architecture interfaced network open architecture Workstation Becomes the mode to gain access to the multiple applications. The user does not have to know or understand what type of hardware or software he or she is accessing, only that there is access to a broad

array of information. The security and confidentiality issues raised by open architecture system are being handled with the installation of security servers, registration centers to register use of information, and/or protocols requiring authorization. System Issues As new technologies are evaluated and upgrading is the considered, the design team or departmental team is considered, the design team or departmental team must reassess the original function requirements with the excising hardware may exist. As far as possible, the team needs to determine if a subsystem can be

added to the working system. New functions might be required, necessitating the procurement of additional hardware. Reference http:// doodlesundae.weebly.com/implementing-and-upgrading-clinical-infor mation-systems.html Amadoron, Katrina Mariz U. Baring, Alvin T. Caales, Eurrikke Edward D.

Recently Viewed Presentations

  • Managing Supply and Demand

    Managing Supply and Demand

    Strategies for Matching Supply and Demand for Services Partitioning Demand at a Health Clinic Discriminatory Fee Schedule for Camping Experience No. of Daily type Days and weeks of camping season days fee 1 Saturdays and Sundays of weeks 10 to...
  • Warm Up - Mrs. Law's World

    Warm Up - Mrs. Law's World

    Warm Up. What was the belief and concern expressed for the plague based on document 1? Beliefs: Clean streets would prevent the plague from coming. Those left behind behaviors of either cutting themselves off from the public or drinking a...
  • 投影片 1 - Wellesley College

    投影片 1 - Wellesley College

    Introduction: Many multi-domain proteins contain small protein modules whose global folds are stabilized by metal binding or disulfide bonds rather than an extensive hydrophobic core or secondary structures.
  • The challenges for revenue growth and profitability in

    The challenges for revenue growth and profitability in

    "The challenges for revenue growth and profitability in a declining interest rate and low inflation environment." Myles Ruck Chief Executive Liberty Group Limited 16 October 2003 In the UK : 1996 - 2000 Declining interest rates Declining inflation Positive life...
  • The 3rd International Conference on Site Characterization

    The 3rd International Conference on Site Characterization

    SDMT MULTIPLE CHOICE QUESTIONNAIRE (ANSWERS) ! ! 1) When performing both DMT and seismic measurements at the same depth, in what order should they be done: Seismic measurements first DMT measurements first In any order Recommended SDMT Test Sequence (DMT...
  • Jeopardy - Kyrene School District

    Jeopardy - Kyrene School District

    What is 28e? 1,4 The two integers 60 falls between What are 7 and 8? 2,1 The categories that -4.2 fits into: Rational, Irrational, Integer, Whole What is Rational? 2,2 1 + 4 ÷ 1 + 3 • 7 +...
  • IEEE 802 40th Anniversary Public Visibility Campaign Proposal

    IEEE 802 40th Anniversary Public Visibility Campaign Proposal

    Strategy Overview. Create a broad and global awareness campaign of IEEE 802 LAN/MAN Standards Committee and how the Standards developed by thousands of IEEE 802 technical experts over the past 40 years has enabled the industry to connect the world,...
  • Taulas hamerianas - Ning

    Taulas hamerianas - Ning

    Dedicado al Dr. D. Fermín Moriano por cuya intercesión conocí al Dr. Hamer y al Dr. Carvajal, viendo nacer la Sintergética en esta intersección.